New Drilling Yard Development

20%

Preparing to share clean water and the Good News with many!

We are currently developing a new operational base/’drilling yard’ in Ivory Coast to facilitate and support our ongoing wells ministry work there.  The site is 1 hectare in size and to date we have constructed:

  • perimeter wall,
  • 15mx15m hangar between two shipping containers,
  • parking bays for small vehicles
  • well supplies store.

Work continues to provide an electrical supply to the site with back-up generator, and to build a basic wood and metal work shop.

GOAL

£15,000

RAISED

£3,000

W Africa
Picture of Ivory Coast

Ivory Coast

Many villages still lack safe drinking water - IC

Equipment includes:
  • Construction materials.
  • Local construction team
  • Yard power supply connection